Curtin University Future Battery Industries EV charging

C7, Perth Western Australia 6102

Public · Reported operational

Up to 24 kW. Check the listed connectors and access before travelling. Reported rates and tariff conditions are listed below when supplied. Live availability is not provided.

Reported charging rate

See tariff notes

Reported rate, not verified. Check the network's tariff before charging.

Connectors and station details

Public

Connectors and rated power

  • CCS2

    CCS (Type 2)

    DC

    24 kW

    Rated maximum

    Listed quantity: 1

  • CHAdeMO

    DC

    24 kW

    Rated maximum

    Listed quantity: 1

Connector quantities are directory counts, not available bays. Equipment may share power or serve one car through alternative plugs.

Charging cost

Parking cost $2.55 per hour during office hours, $1.00 per hour otherwise.

Reported rate, not verified. Check the network's tariff before charging.

Before you arrive

Turn into Future Battery Industries from Brand Drive.

Data: Open Charge Map

Source details

Contributor: Open Charge Map Contributors

Licence: Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Record updated .

Last verification recorded by the source: .

These dates describe the source record. They do not verify charger availability or current tariffs.