Merriden Supercharger EV charging

Barrack Street, Merredin Western Australia 6415

Public · Account required · Reported planned for future date

Up to 250 kW. Check the listed connectors and access before travelling. Reported rates and tariff conditions are listed below when supplied. Live availability is not provided.

Reported charging rate

Rate not listed

Reported rate, not verified. Check the network's tariff before charging.

Connectors and station details

Tesla (including non-tesla)

Reported planned for future date

Connectors and rated power

  • CCS2

    CCS (Type 2)

    DC

    250 kW

    Rated maximum

    Listed quantity: 1 · Reported planned for future date

  • CCS2

    CCS (Type 2)

    250 kW

    Rated maximum

    Listed quantity: 1 · Reported planned for future date

  • CCS2

    CCS (Type 2)

    250 kW

    Rated maximum

    Listed quantity: 1 · Reported planned for future date

Connector quantities are directory counts, not available bays. Equipment may share power or serve one car through alternative plugs.

Charging cost

Tariff not reported. Check the network’s app or website.

Data: Open Charge Map

Source details

Contributor: Open Charge Map Contributors

Licence: Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Record updated .

Last verification recorded by the source: .

These dates describe the source record. They do not verify charger availability or current tariffs.